Just to be clear, this is not a "seamless" link, as cargo will have to be transhipped from the Kenyan SGR to the Kenyan metre gauge at Naivasha (or at some unnamed place in the bush where the SGR ends which is euphemistically being referred to as "Naivasha"), and from there it should be a "seamless" journey from the revamped Kenyan metre gauge to the revamped Ugandan metre gauge.Uganda has signed a Sh5 billion deal with a Chinese firm to revamp its century-old metre gauge railway line between Malaba and Kampala to create seamless travel from the Mombasa port. The 260 kilometre Kampala line will be linked to the standard gauge railway (SGR) track through the Naivasha to Malaba old railway, which Kenya is upgrading...
Uganda to revamp Kampala-Malaba metre gauge
- John Ashworth
- Site Admin
- Posts: 23606
- Joined: 24 Jan 2007, 14:38
- Location: Nairobi, Kenya
- Contact:
Uganda to revamp Kampala-Malaba metre gauge
Uganda builds railway link to Kenya’s SGR
- John Ashworth
- Site Admin
- Posts: 23606
- Joined: 24 Jan 2007, 14:38
- Location: Nairobi, Kenya
- Contact:
Re: Uganda to revamp Kampala-Malaba metre gauge
Uganda, Kenya team up on old metre gauge rail project eyeing Congo, S. Sudan
Keep the rail connectedWith an eye on the Democratic Republic of Congo and South Sudan markets, there is renewed vibrancy on the Northern Corridor, as Uganda and Kenya join forces to push the rehabilitation and seamless connection of the old metre gauge railway line, over which the two countries’ officials met this week to thrash out operational details...
The plan to create a seamless rail transport from the Mombasa port to Kampala is a step in the right direction. Uganda has signed a Sh5 billion deal with a Chinese firm to revamp its century-old metre gauge railway line between Malaba and Kampala. The 260 kilometre Kampala line will be linked to the standard gauge railway (SGR) track through the Naivasha to Malaba old railway, which Kenya is upgrading...
- John Ashworth
- Site Admin
- Posts: 23606
- Joined: 24 Jan 2007, 14:38
- Location: Nairobi, Kenya
- Contact:
Re: Uganda to revamp Kampala-Malaba metre gauge
Ugandan parliament approves €327m Kampala – Malaba line refurbishment
THE Ugandan parliament has approved the government’s plans to borrow €327.01m to support the Kampala – Malaba Metre Gauge Railway Projec to refurbish the existing line from the Ugandan capital to the Kenyan border...