TAZARA - Track Re-Built, Operations Restored

Other railway topics related to the rest of Africa
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

TAZARA - Track Re-Built, Operations Restored

Post by John Ashworth »

TAZARA - Track Re-Built, Operations Restored
The Tanzania-Zambia Railway Authority (TAZARA) has re-constructed the track formation that got damaged at KM32 in Mwakanga (32Km South West of Dar es Salaam), following a landslide that occurred on 30th April 2020 and resulted in the track being rendered impassable...
Image
Post Reply

Return to “Rest of Africa - Other Railway Topics”