8. January 2008 - Wiring is made permanent.

A Forum that is covering a build of a European HO layout at the Model Train Exchange.
Post Reply
Kevin Wilson-Smith

8. January 2008 - Wiring is made permanent.

Post by Kevin Wilson-Smith »

Wiring is made permanent - tidied up. Again see the photo captions.
Attachments
Track power wires soldered onto the rails.
Track power wires soldered onto the rails.
Track power wires from underneath - multiple connections exist for "block" wiring.
Track power wires from underneath - multiple connections exist for "block" wiring.
Point wiring completed.
Point wiring completed.
Point wires from underneath.
Point wires from underneath.
Another train weaves around!
Another train weaves around!