9. January 2008 - Wiring progresses + control panel start.

Post by Kevin Wilson-Smith »

Final wiring for the bottom track work is now being put in, and the control panel being fitted. See captions.
Attachments
A start is made on the under table wiring connections. Note under the tabletop the channeling that has been put in p[lace for the wires.
A start is made on the under table wiring connections. Note under the tabletop the channeling that has been put in p[lace for the wires.
Wire going into the channeling.
Wire going into the channeling.
The control panel starts to take shape.
The control panel starts to take shape.