40. December 2008 - The upper extension goes further...

A Forum that is covering a build of a European HO layout at the Model Train Exchange.
Post Reply
Kevin Wilson-Smith

40. December 2008 - The upper extension goes further...

Post by Kevin Wilson-Smith »

In Part 32 the upper extension to the spiral was done. This is now continued around the back to the right hand side. A clcokwise tour of progress......

Photo 1 shows the left upper spiral as a reference starting point.

Photo 2 - Elevated area for some sidings.

Photo 3 - Corner showing the access galleries.

Photo 4 - Peering down - 3 levels.

Photo 5 - Out of the corner and along past the bridge.

Photo 6 - View down the back, showing to the left the next area to be worked on to bring it up to the level of the finished elevations........
Attachments
Photo locations
Photo locations
Photo 1 shows the left upper spiral as a reference starting point
Photo 1 shows the left upper spiral as a reference starting point
Photo 2 - Elevated area for some sidings.
Photo 2 - Elevated area for some sidings.
Photo 3 - Corner showing the access galleries.
Photo 3 - Corner showing the access galleries.
Photo 4 -  Peering down - 3 levels.
Photo 4 - Peering down - 3 levels.
Photo 5 - Out of the corner and along past the bridge.
Photo 5 - Out of the corner and along past the bridge.
Photo 6 - View down the back, showing to the left the next area to be worked on to bring it up to the level of the finished elevations........
Photo 6 - View down the back, showing to the left the next area to be worked on to bring it up to the level of the finished elevations........
Post Reply

Return to “MTE Model Railway Layout Build #1 - HO European Layout.”