Cleaning went on while the train was away.

Pictures of FOTR's first "trial run" of a pssenger train from our new site at Hermanstad on 27th July 2008
Post Reply
Kevin Wilson-Smith

Cleaning went on while the train was away.

Post by Kevin Wilson-Smith »

On the sidelines cleaning at the site went on when the passenger train was out.
Attachments
John stops the wagons moving.<br />K R Wilson-Smith 27/07/08
John stops the wagons moving.
K R Wilson-Smith 27/07/08
Hosing out a gondola.<br />K R Wilson-Smith 27/07/08
Hosing out a gondola.
K R Wilson-Smith 27/07/08
Its more fun if you wave the hose!<br />K R Wilson-Smith 27/07/08
Its more fun if you wave the hose!
K R Wilson-Smith 27/07/08
Pipes are stacked.<br />K R Wilson-Smith 27/07/08
Pipes are stacked.
K R Wilson-Smith 27/07/08
Post Reply

Return to “Hermanstad - first passenger train - 27 July 2008”