Nathan wrote:With the coaching stock removed from the fence line, it was chance to remove the rails that had been dumped there from the early days of our track laying and site levelling days.
Hermanstad track relocation August 2013
- John Ashworth
- Site Admin
- Posts: 23606
- Joined: 24 Jan 2007, 14:38
- Location: Nairobi, Kenya
- Contact:
Hermanstad track relocation August 2013
Photos and captions by Nathan Berelowitz, August 2013
- Attachments
-
- Here we see a portion of the track waiting to be removed by use of a TLB machine and "Pekenese " overseeing the operation.
- DSCN1139.jpg (66.7 KiB) Viewed 1469 times
-
- DSCN1142.jpg (106.86 KiB) Viewed 1469 times
-
- Long lengths of rail are manhandled by the TLB, almost like a mother elephant reaching for her young!
- DSCN1149.jpg (64.08 KiB) Viewed 1469 times
-
- DSCN1150.jpg (137.18 KiB) Viewed 1469 times
-
- The track stack at the Western end.
- DSCN1151.jpg (82.65 KiB) Viewed 1469 times
-
- TLB gently lays down the rails
- DSCN1152.jpg (89.13 KiB) Viewed 1469 times
-
- Unearthing track from the embankment.
- DSCN1153.jpg (109.22 KiB) Viewed 1469 times
-
- DSCN1154.jpg (127.48 KiB) Viewed 1469 times
-
- Plenty of track lying amongst the ground!
- DSCN1156.jpg (131.97 KiB) Viewed 1469 times
-
- DSCN1157.jpg (142.5 KiB) Viewed 1469 times
-
- DSCN1161.jpg (94.23 KiB) Viewed 1469 times
-
- DSCN1163.jpg (84.45 KiB) Viewed 1469 times