Liesel wrote:As you can see, I've had a very busy but successful past two days. Awful weather and truck mechanical problems did not help. These are yesterdays pics of the tanks being dismantled and generator being loaded before the crane gave problems and was sent back to Nigel for repairs.
Hermanstad tanks and generator - 1
- John Ashworth
- Site Admin
- Posts: 23606
- Joined: 24 Jan 2007, 14:38
- Location: Nairobi, Kenya
- Contact:
Hermanstad tanks and generator - 1
Two different companies kindly donated a 3-phase generator and two storage tanks which were surplus to requirements to FOTR for the Hermanstad site. After some delays FOTR members, led by Liesel, were able to transport them to Hermanstad in mid-December 2010.