Hermanstad Update 5th March 2011

Members can post FOTR related pictures of the new Hermanstad Site here - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will be pruned after 90 days. If you want to keep them for later, save them to your hard drive!
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Hermanstad Update 5th March 2011

Post by John Ashworth »

Photos and captions by Nathan Berelowitz, 5th March 2011
Attachments
James Smith arranged for the start of sorting the rails out on our storage section. He has arranged three concrete main line sleepers to be the base for the heavy track. Then the truck burst its hydraulic pipes and that was all that was achieved in a morning!!
James Smith arranged for the start of sorting the rails out on our storage section. He has arranged three concrete main line sleepers to be the base for the heavy track. Then the truck burst its hydraulic pipes and that was all that was achieved in a morning!!
hermanstad site update 5march 2011 005.jpg (95.59 KiB) Viewed 1125 times
The storage yard looking Eastwards to the main gate. Watch this space!
The storage yard looking Eastwards to the main gate. Watch this space!
hermanstad site update 5march 2011 006.jpg (79.57 KiB) Viewed 1125 times
Steve Smith assisted by Tom, Raymond and Welcome, as he constructs the shed roof to protect the diesel generator. Now we know why the hoarding of material is so important!
Steve Smith assisted by Tom, Raymond and Welcome, as he constructs the shed roof to protect the diesel generator. Now we know why the hoarding of material is so important!
hermanstad site update 5march 2011 002.jpg (71.16 KiB) Viewed 1125 times
hermanstad  site update 5march 2011 003.jpg
hermanstad site update 5march 2011 003.jpg (59.65 KiB) Viewed 1125 times
Tom about to assist Steve Smith as he finishes off a roof sheet for the newly constructed covering for the generator. Note the roof is on and soon painting will commence.
Tom about to assist Steve Smith as he finishes off a roof sheet for the newly constructed covering for the generator. Note the roof is on and soon painting will commence.
hermanstad site update 5march 2011 007.jpg (47.03 KiB) Viewed 1125 times
Image
Post Reply

Return to “FOTR - The New Hermanstad Site”