CPK: a good day's work

Members can post FOTR related pictures of Capital Park here - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will be pruned after 90 days. If you want to keep them for later, save them to your hard drive!
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

CPK: a good day's work

Post by John Ashworth »

Saturday 11th May. Today there were around a dozen blokes working at CPK most of the day, with up to 14 at one point. That number hasn't been seen regularly since the days when myself, Mike "Turtle" Haslam, Mike James and a few other old hands were around. Gabor and the firelighting team got a lot of work done during the night. In the morning there was a shunt, and at one point four different teams were working on four different things. If only it could happen like that every Saturday...

Photos by John Ashworth
Attachments
Rovos Rail kindly lent us their 19D no 3360 after our own Dolly failed with a leaking tube. 3360 stands on the pit for attention to her grease pads.
Rovos Rail kindly lent us their 19D no 3360 after our own Dolly failed with a leaking tube. 3360 stands on the pit for attention to her grease pads.
prep_P1000581.JPG (113.72 KiB) Viewed 2223 times
But has 3360 got two tenders?
But has 3360 got two tenders?
prep_P1000582.JPG (112.8 KiB) Viewed 2223 times
No, but the tender of 19D no 2650 was split from the loco earlier and stands on the pit.
No, but the tender of 19D no 2650 was split from the loco earlier and stands on the pit.
prep_P1000580.JPG (113.03 KiB) Viewed 2223 times
The other half of the unusual sight - a tenderless 19D no 2650.
The other half of the unusual sight - a tenderless 19D no 2650.
prep_P1000576.JPG (120.44 KiB) Viewed 2223 times
One team adjusts the brakes on the water tank while another prepares 2650 for a new tube.
One team adjusts the brakes on the water tank while another prepares 2650 for a new tube.
prep_P1000583.JPG (158.06 KiB) Viewed 2223 times
The auxiliary water tank also had to be filled from the washout pump.
The auxiliary water tank also had to be filled from the washout pump.
prep_P1000578.JPG (142.78 KiB) Viewed 2223 times
The vacuum pipe on the 15CA gets some attention.
The vacuum pipe on the 15CA gets some attention.
prep_P1000579.JPG (117.71 KiB) Viewed 2223 times
The DZ with an old cab on it has been shunted under the gantry.
The DZ with an old cab on it has been shunted under the gantry.
prep_P1000577.JPG (116.91 KiB) Viewed 2223 times
Image
User avatar
Nathan Berelowitz
Posts: 2196
Joined: 25 Jan 2007, 14:17
Location: Pretoria, South Africa

Re: CPK: a good day's work

Post by Nathan Berelowitz »

WONDERFULL. GREAT AND JUST LIKE BACK IN THE DAY!!!