Coach lifting 2
Photos and captions by Nathan Berelowitz, 4th July 2010
- Attachments
-
- Axle boxes, bearings and wool packings checked and ok. Cover is painted black
- coach lifting 001.jpg (40.3 KiB) Viewed 1379 times
-
- Correct stencilling
- coach lifting 002.jpg (36.77 KiB) Viewed 1379 times
-
- Vacuum cylinder stencilled and FOR depot code used. Note the ring marked on the piston rod of the vacuum cylinder. This will be the mark to show drop off once vacuum created. Must hold at least 10 mins before leaking off. This one well over an hour
- coach lifting 003.jpg (40.09 KiB) Viewed 1379 times
-
- Yellow for lifting dates. There was no stencil to place 60 for the months between lifting, so it reads 12, this will be sorted out soon. The white script is the oiling dates on a three month cycle.
- coach lifting 004.jpg (38.02 KiB) Viewed 1379 times
-
- coach lifting 005.jpg (31.85 KiB) Viewed 1379 times
-
- coach lifting 006.jpg (39.51 KiB) Viewed 1379 times
-
- Caboose
- coach lifting 008.jpg (47.19 KiB) Viewed 1379 times
-
- Caboose
- coach lifting 011.jpg (39.92 KiB) Viewed 1379 times
-
- Vacuum pan stencilled with date
- coach lifting 016.jpg (45.84 KiB) Viewed 1379 times
-
- Oiling dates placed..
- coach lifting 027.jpg (33.82 KiB) Viewed 1379 times
-
- Posts: 857
- Joined: 25 Jan 2007, 13:10
- Location: Pretoria, South Africa
Re: Coach lifting 2
Yes!
Well done and thanks to all.
Well done and thanks to all.