A series of manual tracklaying at Hermanstad.
Photos and captions by Nathan Berelowitz, January 2011
Hermanstad: tracklaying 29-30 Jan2011 - 2
- John Ashworth
- Site Admin
- Posts: 23606
- Joined: 24 Jan 2007, 14:38
- Location: Nairobi, Kenya
- Contact:
Hermanstad: tracklaying 29-30 Jan2011 - 2
- Attachments
-
- Panel number two in place.
- capital park and hermanstas and Gautrain 28+29 Jan 2010 034.jpg (108.83 KiB) Viewed 1210 times
-
- Long way to go for panel three.
- capital park and hermanstas and Gautrain 28+29 Jan 2010 035.jpg (113.67 KiB) Viewed 1210 times
-
- Starting to look better.
- capital park and hermanstas and Gautrain 28+29 Jan 2010 036.jpg (116.63 KiB) Viewed 1210 times
-
- Pulling panel three.
- capital park and hermanstas and Gautrain 28+29 Jan 2010 037.jpg (113.38 KiB) Viewed 1210 times
-
- Panel three is almost in place, just needing some old car oil and a few inches and it is there.
- capital park and hermanstas and Gautrain 28+29 Jan 2010 040.jpg (81.02 KiB) Viewed 1210 times
-
- capital park and hermanstas and Gautrain 28+29 Jan 2010 041.jpg (55.61 KiB) Viewed 1210 times
-
- capital park and hermanstas and Gautrain 28+29 Jan 2010 042.jpg (94.77 KiB) Viewed 1210 times
-
- The three panels in place now just need final alignment.
- capital park and hermanstas and Gautrain 28+29 Jan 2010 043.jpg (75.38 KiB) Viewed 1210 times
-
- Now to get those bloody fishplates to fit.
- capital park and hermanstas and Gautrain 28+29 Jan 2010 044.jpg (85.4 KiB) Viewed 1210 times
-
- The track jack is sio handy when angles for fishplates are not quite correct!
- capital park and hermanstas and Gautrain 28+29 Jan 2010 046.jpg (80.57 KiB) Viewed 1210 times