Hermanstad: pointwork 3rd July 2011

Members can post FOTR related pictures of the new Hermanstad Site here - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will be pruned after 90 days. If you want to keep them for later, save them to your hard drive!
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Hermanstad: pointwork 3rd July 2011

Post by John Ashworth »

Photos and captions by Nathan Berelowitz, Hermanstad, 3rd July 2011
Attachments
July 3rd 2011 and work on upgrading the tracks is progressing well. Tony Attwell, Tequila the dog and Steve Smith examining the newly laid rail and note that the left points blade area needs a bit of ballast tamping.
July 3rd 2011 and work on upgrading the tracks is progressing well. Tony Attwell, Tequila the dog and Steve Smith examining the newly laid rail and note that the left points blade area needs a bit of ballast tamping.
hermanstad update july 2011 001.jpg (93.92 KiB) Viewed 1082 times
Thomas and Welcome hard at work replacing a sleeper at the points. Much needed repair work is in progress during the winter months.
Thomas and Welcome hard at work replacing a sleeper at the points. Much needed repair work is in progress during the winter months.
hermanstad update july 2011 003.jpg (103.98 KiB) Viewed 1082 times
Robert Dadford looks satisfied with the trackwork in progress
Robert Dadford looks satisfied with the trackwork in progress
hermanstad update july 2011 004.jpg (96.24 KiB) Viewed 1082 times
Looking Eastwards to our departure and arrival gate, the trackwork will soon be at mainline standards!
Looking Eastwards to our departure and arrival gate, the trackwork will soon be at mainline standards!
hermanstad update july 2011 005.jpg (61.09 KiB) Viewed 1082 times
Image
Post Reply

Return to “FOTR - The New Hermanstad Site”