28. October 2008 - Control Panel Completed & Marked Up.

A Forum that is covering a build of a European HO layout at the Model Train Exchange.
Post Reply
Kevin Wilson-Smith

28. October 2008 - Control Panel Completed & Marked Up.

Post by Kevin Wilson-Smith »

The control panel is now fitted and marked up.

This means that running a train is now longer an arcane art restricted to a few!

Note that the panel schematic (remember it is not to scale) does provide a fair idea of the finished track plan.

Photo 1 - The complete panel.

Photo 2 - The complete panel showing the relationship between the different track areas.

Photo 3 - The hidden or lower level.

Photo 4 - Station B - a small station on the upper level where the line comes of the spiral.

Photo 5 - Station A - a larger station towards the middle of the layout.
Attachments
Photo 1 - The complete panel.
Photo 1 - The complete panel.
p1.JPG (130.59 KiB) Viewed 1248 times
Photo 2 - The complete panel showing the relationship between the different track areas.
Photo 2 - The complete panel showing the relationship between the different track areas.
Photo 3 - The hidden or lower level.
Photo 3 - The hidden or lower level.
Photo 4 - Station B - a small station on the upper level where the line comes of the spiral
Photo 4 - Station B - a small station on the upper level where the line comes of the spiral
Photo 5 - Station A - a larger station towards the middle of the layout.
Photo 5 - Station A - a larger station towards the middle of the layout.
Post Reply

Return to “MTE Model Railway Layout Build #1 - HO European Layout.”