6. January 2008 - Bottom Section Track Completed!

A Forum that is covering a build of a European HO layout at the Model Train Exchange.
Post Reply
Kevin Wilson-Smith

6. January 2008 - Bottom Section Track Completed!

Post by Kevin Wilson-Smith »

A short sprint in terms of track laying and the bottom section was completed. Short golden spike ceremony!

Running tests on the tracks were then carried to ensure that the operation was smooth and acceptable, especially since access to the track work will be limited (remember all this track will be covered up/hidden by the top section) as the build progresses.
Attachments
Eric follows the carriages around looking for uneven track sections.
Eric follows the carriages around looking for uneven track sections.
A train corners trough into the yard
A train corners trough into the yard
Adjustments. The Dremel in the foreground is used to cut flexitrack.
Adjustments. The Dremel in the foreground is used to cut flexitrack.
A German engine comes through the yard hauling a long rake.
A German engine comes through the yard hauling a long rake.