Gautrain water ingress: no timeline, says Engineering News

For discussions on stations, signals, and infrastructure in Southern Africa. Any photos should be posted in the "South Africa - Photo Gallery" Forum below.
Post Reply
User avatar
Steve Appleton
Site Admin
Posts: 3605
Joined: 23 Jan 2007, 14:14
Location: Johannesburg, South Africa

Gautrain water ingress: no timeline, says Engineering News

Post by Steve Appleton »

Engineering News, 13 January 2015, reports:

"No timeline, costs finalised for Gautrain water ingress fix."

BY: IRMA VENTER As yet, no specific methodology, timeline or costs have been finalised to remedy the water ingress, excessive to contractual specifications, into the Gautrain tunnel between emergency shaft two (E2) and Park Station, says Bombela Concession Company technical and marketing executive...

Full story at http://www.engineeringnews.co.za/articl ... ep_id:3182
"To train or not to train, that is the question"
Post Reply

Return to “South Africa - Stations, Signals and Infrastructure”