Page 1 of 1

Hercules - Rail, rope, removal

Posted: 07 Jul 2008, 06:26
by John Ashworth
Nathan wrote:One way of moving track! Cleaning up the area by the current entrance, the
resident truck is at work on a Saturday afternoon. In the background can be
seen a small shed structure, which will be cover for the multitude of steel
pipes etc we have accumulated. Much of the relocated steel and machinery
from the old site will be stored in this area under cover, until permanent
structures are erected.

Re: Hercules - Rail, rope, removal

Posted: 12 Jul 2008, 05:46
by Nathan Berelowitz
The doga waiting eagerly in the background, could easily be harnessed to move rail, sleigh style on the site!

Re: Hercules - Rail, rope, removal

Posted: 12 Jul 2008, 05:47
by Nathan Berelowitz
Doga?, I mean dogs!!

Re: Hercules - Rail, rope, removal

Posted: 12 Jul 2008, 06:35
by John Ashworth
And there was me thinking a doga was some rare Santa-like reindeer which had appeared out of the wilderness of the overgrown old Magaliesberg line at the end of our site, where the last few remaining members of the species had taken refuge, and was just waiting to help FOTR establish the new site...