Daspoort signal
Posted: 08 Sep 2008, 06:21
Photo by Nathan Berelowitz 7th September 2008Nathan wrote:When doing the Cullinan trains, the load is pulled into Hercules station and
then propelled back to the signals at Daspoort. This is a delicate mainlihne
operatiojn, and this signal viewed here is our final one to stop at, for
the clearance to proceed onwards to Capital Park route.