Page 1 of 1

Daspoort signal

Posted: 08 Sep 2008, 06:21
by John Ashworth
Nathan wrote:When doing the Cullinan trains, the load is pulled into Hercules station and
then propelled back to the signals at Daspoort. This is a delicate mainlihne
operatiojn, and this signal viewed here is our final one to stop at, for
the clearance to proceed onwards to Capital Park route.
Photo by Nathan Berelowitz 7th September 2008