25. August 2008 - More preparation for the second level.

A Forum that is covering a build of a European HO layout at the Model Train Exchange.
Post Reply
Kevin Wilson-Smith

25. August 2008 - More preparation for the second level.

Post by Kevin Wilson-Smith »

Work continues preparing for the second level.

In essence the one side of the layout has merely a second level - the other side is a bit more mountainous and contains a hidden loop.

Photo one shows the second level track in place, plus the risers now in for the scenery. Photo2 shows a view of the same area from a different angle.

Photo 3 shows the loop area cut out, with one of the circular track risers for the loop in the foreground.

Construction of the circular riser is relatively simple - photo 4 shows you how this done.
Attachments
KRWS - August 2008
KRWS - August 2008
KRWS - August 2008
KRWS - August 2008
KRWS - August 2008
KRWS - August 2008
KRWS - August 2008
KRWS - August 2008
4.JPG (126.19 KiB) Viewed 1287 times
Post Reply

Return to “MTE Model Railway Layout Build #1 - HO European Layout.”