Kevin Wilson-Smith

49. January 2009 - Top level risers go into place

Post by Kevin Wilson-Smith »

With the lower track levels now largely finished and joined up, the risers for the next (and final!!!!) levels are now being put in place.

Starting to look even more complicated.

Photo 1 - The first set of risers clamped into place.

Photo 2 - As above.

Photo 3 - From the side here can be seen an extra transition loop put in- to basically ease the climb.

Photo 4 - View from the other side.

Photo 5 - View alongside showing where the upper levels will be joined.
Attachments
layout1.jpg
Photo 1 - The first set of risers clamped into place.
Photo 1 - The first set of risers clamped into place.
Photo 2 - As above.
Photo 2 - As above.
Photo 3 - From the side here can be seen an extra transition loop put in- to basically ease the climb.
Photo 3 - From the side here can be seen an extra transition loop put in- to basically ease the climb.
Photo 4 - View from the other side.
Photo 4 - View from the other side.
Photo 5 - View alongside showing where the upper levels will be joined.
Photo 5 - View alongside showing where the upper levels will be joined.