2650 at Control Point 35

Members can post FOTR related pictures of 19D 2650 here - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will be pruned after 90 days. If you want to keep
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

2650 at Control Point 35

Post by John Ashworth »

Photos and captions by Nathan Berelowitz, 12th December 2009
Attachments
Running up to control point 35, the 19D is at the start of her day with a FOTR train to Cullinan
Running up to control point 35, the 19D is at the start of her day with a FOTR train to Cullinan
December Cullinan2009 003.jpg (72.38 KiB) Viewed 1008 times
At control point 35, the 19D waits the signal to set back towards Hercules Station. This control point is on the approach to the shunt yards at Capital Park
At control point 35, the 19D waits the signal to set back towards Hercules Station. This control point is on the approach to the shunt yards at Capital Park
December Cullinan2009 006.jpg (72.45 KiB) Viewed 1008 times
Image
Post Reply

Return to “FOTR - Steam Engine 19D 2650”