Gautrain progress: September 2010

Photos of the Gautrain System! Photos should be 800x600 pixels, maximum size 130K. Very good ones will be moved to the Online Gallery, the rest may be pruned away after 14 days to conserve space.
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Gautrain progress: September 2010

Post by John Ashworth »

Photos and captions by Nathan Berelowitz, 26 September 2010
Attachments
Approaching Pretoria station the Gautrain construction is rapidly progressing
Approaching Pretoria station the Gautrain construction is rapidly progressing
DSC_4157.jpg (57.36 KiB) Viewed 2037 times
The approach to Pretoria Station now under cover
The approach to Pretoria Station now under cover
DSC_4158.jpg (74.94 KiB) Viewed 2037 times
Looking back under the new bridge at the approach to Pretoria.
Looking back under the new bridge at the approach to Pretoria.
DSC_4160.jpg (74.17 KiB) Viewed 2037 times
Under the bridge approaching Pretoria, the yellow light of the signal calls the train on.
Under the bridge approaching Pretoria, the yellow light of the signal calls the train on.
DSC_4171.jpg (80.55 KiB) Viewed 2037 times
This very broad gauge diesel shunter and ballast hopper on the Gautrain line in Pretoria station
This very broad gauge diesel shunter and ballast hopper on the Gautrain line in Pretoria station
DSC_4174.jpg (80.53 KiB) Viewed 2037 times
Image
User avatar
Andreas Umnus
Posts: 479
Joined: 06 Jun 2008, 00:38
Location: Lingen (Ems), Germany

Re: Gautrain progress: September 2010

Post by Andreas Umnus »

Thank you for giving us this interesting impressions.

You might think that the shunter is broad and you are right. But always when I saw the steam locos in South Africa when I was there, I
thought they are much bigger than our steam locos, even if you have only the 1067 mm guage and we have the 1435 mm gauge like the shunter in your picture.
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Re: Gautrain progress: September 2010

Post by John Ashworth »

South African railways have a very broad loading gauge despite having a narrow track gauge. Ironically the broad gauge (ie standard gauge) Gautrain has a smaller loading gauge as it is basically a British train with new bogies (and a few extra traction motors), built to the very limited British loading gauge.
Image
User avatar
Luca Lategan
Posts: 457
Joined: 16 Nov 2007, 12:04
Location: stellenbosch

Re: Gautrain progress: September 2010

Post by Luca Lategan »

That diesels are broad. Too broad to fit into the Gautrain tunnels..
Luca Lategan...
Post Reply