Hermanstad tanks and generator - 1

Members can post FOTR related pictures of the new Hermanstad Site here - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will be pruned after 90 days. If you want to keep them for later, save them to your hard drive!
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Hermanstad tanks and generator - 1

Post by John Ashworth »

Two different companies kindly donated a 3-phase generator and two storage tanks which were surplus to requirements to FOTR for the Hermanstad site. After some delays FOTR members, led by Liesel, were able to transport them to Hermanstad in mid-December 2010.
Liesel wrote:As you can see, I've had a very busy but successful past two days. Awful weather and truck mechanical problems did not help. These are yesterdays pics of the tanks being dismantled and generator being loaded before the crane gave problems and was sent back to Nigel for repairs.
Attachments
002.jpg
002.jpg (51.09 KiB) Viewed 1101 times
004.jpg
004.jpg (57.56 KiB) Viewed 1101 times
006.jpg
006.jpg (46.69 KiB) Viewed 1101 times
007.jpg
007.jpg (45.03 KiB) Viewed 1101 times
009.jpg
009.jpg (53.73 KiB) Viewed 1101 times
010.jpg
010.jpg (45.89 KiB) Viewed 1101 times
012.jpg
012.jpg (69.31 KiB) Viewed 1101 times
Image
Post Reply

Return to “FOTR - The New Hermanstad Site”