Page 1 of 1

5. December 2007 - Testing Interlude - Heavy Metal Growls.

Posted: 09 Jan 2008, 18:02
by Kevin Wilson-Smith
Probably half of the hidden track work down means that basic testing can be carried out, as a usable loop is now in place!

To celebrate the occasion a couple of ceremonial runs are made using some US and European engines.

An Alco is present!

All this is carried out in the name of testing and ensuring the tracks smoothness!