Page 1 of 1

TAZARA - Track Re-Built, Operations Restored

Posted: 01 Jun 2020, 11:00
by John Ashworth
TAZARA - Track Re-Built, Operations Restored
The Tanzania-Zambia Railway Authority (TAZARA) has re-constructed the track formation that got damaged at KM32 in Mwakanga (32Km South West of Dar es Salaam), following a landslide that occurred on 30th April 2020 and resulted in the track being rendered impassable...