The first consignment of concrete sleepers has arrived on site.
Pandol clips will need to be purchased to secure rails to the sleepers before the sleepers can be used.
The line at the entrance to the FOTR yard has been aligned to the centre of the entrance gate.
The original panel has been removed and a custom built bridging rail has been put into place.
The set of right hand points has been moved into place and connected to the bridging rail.
Three panels have been moved into place on the right hand turnout of the points and will be connected once the alignment of the track has been checked.
The points sleepers are being replaced.
Update: Hermanstad site July/August 2009
- John Ashworth
- Site Admin
- Posts: 23606
- Joined: 24 Jan 2007, 14:38
- Location: Nairobi, Kenya
- Contact:
Update: Hermanstad site July/August 2009
Photos and text by James Smith
- Attachments
-
- clip_image002.jpg (36.74 KiB) Viewed 1297 times
-
- clip_image004.jpg (47.05 KiB) Viewed 1295 times
-
- clip_image006.jpg (41.16 KiB) Viewed 1298 times
-
- clip_image008.jpg (49.23 KiB) Viewed 1297 times
-
- clip_image010.jpg (52.9 KiB) Viewed 1297 times
-
- clip_image012.jpg (52.23 KiB) Viewed 1296 times
-
- clip_image014.jpg (40.74 KiB) Viewed 1297 times
- Nathan Berelowitz
- Posts: 2196
- Joined: 25 Jan 2007, 14:17
- Location: Pretoria, South Africa
Re: Update: Hermanstad site July/August 2009
Wonderfull, and it is getting better, now we are replacing the wood on the points and John D has found a points blade that he is modifying and will fit soon. Thanks to James for overseeing the project.