2650 stands at Greenview

Post pictures of FOTR trips and events - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will eventually be pruned, so make sure you have copies on your hard drive if you want to keep them.
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

2650 stands at Greenview

Post by John Ashworth »

On Friday 10th December 2010 our Cullinan train, hauled by class 19D no 2650, stood for four and a half hours at signal GNW 252 at Greenview, due to various problems with signals and points. Passengers were detrained and sent to Cullinan by bus, and eventually we decided to run the loco round the train and haul the coaches back to Hermanstad empty, as it was too late to continue to Cullinan and the passengers wouldn't have got home until 8 pm or later. Buses brought them back to Hermanstad more or less on time.

Photos by John Ashworth
Attachments
2650_gnw252_IMG_4010.JPG
2650_gnw252_IMG_4010.JPG (85.27 KiB) Viewed 3460 times
2650_gnw252_IMG_4013.JPG
2650_gnw252_IMG_4013.JPG (72.93 KiB) Viewed 3460 times
2650_gnw252_IMG_4014.JPG
2650_gnw252_IMG_4014.JPG (81.19 KiB) Viewed 3460 times
2650_gnw252_IMG_4015.JPG
2650_gnw252_IMG_4015.JPG (76.77 KiB) Viewed 3460 times
Image
User avatar
Luca Lategan
Posts: 457
Joined: 16 Nov 2007, 12:04
Location: stellenbosch

Re: 2650 stands at Greenview

Post by Luca Lategan »

P A T H E T I C

Did they (Transnet) even ask for forgiveness? Are you going to get double your YQ fees back? I'm sure you took the honoust thing and refunded the pax money or gave them a free trip.
Luca Lategan...
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Re: 2650 stands at Greenview

Post by John Ashworth »

Sadly this has become a common occurrence in recent weeks. I think three of our trains have failed to reach Cullinan recently, and most have been arriving very late with a lot of frustration. Our Tshwane Xplorer train yesterday was also severely delayed. In some cases we have given passengers a complete refund, which is obviously a great financial blow to us, as is the extra cost of buses. What is perhaps worse is the damage to our reputation. Although we explain to passengers that these situations are completely beyond our control, nevertheless it makes a steam train journey very unattractive to them and we fear that we will begin to lose business as a result. We are exploring whether we can get a refund from TFR of any of the access fees, but it's not straightforward as in many of these cases they can say it was due to circumstances which were also beyond their control (eg sleeper theft on the Cullinan branch again, an incident in Bronkhorstspruit which required a lot of attention from them, points and signals failures, etc).
Image
User avatar
Derek Walker
Posts: 726
Joined: 27 Jan 2009, 19:09
Location: United Kingdom
Contact:

Re: 2650 stands at Greenview

Post by Derek Walker »

Pathetic. The fact remains that you enter into an agreement with them just as your passengers enter an agreement with you. If they are unable to deliver then a refund should be forthcoming irrespective of whether it was beyond their control or not. Just as you refund your own passengers. I dont think they really give a hoot though, and its a very worrying thing for FotR and I hope that an amicable solution can be reached.
Not quite on the rails.
Check out my train vids. http://www.youtube.com/user/nixops
User avatar
Stefan Andrzejewski
Posts: 864
Joined: 01 Dec 2008, 17:10
Location: Cape Town
Contact:

Re: 2650 stands at Greenview

Post by Stefan Andrzejewski »

Why can't this be overridden and just continue. Its not like there are millions of trains around. Are they not doing this on purpose to try and get you of the lines permanently.
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Re: 2650 stands at Greenview

Post by John Ashworth »

In this case they couldn't give us an authority number to pass the signal at danger as the points at Panpoort were also out and had to be cranked by hand. Crank handles are no longer kept near the points in locked boxes as they were stolen for scrap and also used to sabotage trains, so a crank handle has to be brought out by a section manager. In this instance there were no section managers available.

All our recent trains to Cullinan have been significantly delayed by the signal problems. Stopping at each signal and phoning for an authority number takes time. It was only on this occasion that we got stopped for so long because of the points.
Image
User avatar
Steve Appleton
Site Admin
Posts: 3606
Joined: 23 Jan 2007, 14:14
Location: Johannesburg, South Africa

Re: 2650 stands at Greenview

Post by Steve Appleton »

Hi Stefan,
This was not done on purpose. We actually have a very good working relationship with TFR operations. There are inefficiencies in the TFR system for sure, but deliberate obstruction and ulterior motives are definately not amongst them. The problem seems to be a combination of communications and signalling equipment power failures accompanied by vandalism. It seems that being a freight railway, TFR is better able to accomodate or tolerate these kinds of delays and problems than ourselves and our passengers. No doubt TFR's maintenance and repair sevices could be better but given the age of the installation, the current stormy weather conditions and the location of the dead-signalled section, perhaps it is easy to be over-judgemental.
In essence, the lack of signals and the in-operative points have practically turned Greenview to Rayton into a long single-line section with trains controlled manually using SD1 and 2 authorities which can mean long delays waiting for trains to exit the section. As I explained to one of our groups of passengers, rather experience a delay to err on the side of safety than not.
Now we know about some of the issues, we do try to insist that the TFR pilot carries a points crank which can save calling out section managers and reduce the delays. This also facilitates a crossing mid-way at van der Merwe if need be.
"To train or not to train, that is the question"
Post Reply

Return to “FOTR Trips and Events”