Hercules - Rail, rope, removal

Members can post FOTR related pictures of the new Hermanstad Site here - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will be pruned after 90 days. If you want to keep them for later, save them to your hard drive!
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Hercules - Rail, rope, removal

Post by John Ashworth »

Nathan wrote:One way of moving track! Cleaning up the area by the current entrance, the
resident truck is at work on a Saturday afternoon. In the background can be
seen a small shed structure, which will be cover for the multitude of steel
pipes etc we have accumulated. Much of the relocated steel and machinery
from the old site will be stored in this area under cover, until permanent
structures are erected.
Attachments
Photo by Nathan Berelowitz 5th July 2008
Photo by Nathan Berelowitz 5th July 2008
Hercules newsiteJuly62008 014.jpg (76.78 KiB) Viewed 1719 times
Image
User avatar
Nathan Berelowitz
Posts: 2196
Joined: 25 Jan 2007, 14:17
Location: Pretoria, South Africa

Re: Hercules - Rail, rope, removal

Post by Nathan Berelowitz »

The doga waiting eagerly in the background, could easily be harnessed to move rail, sleigh style on the site!
User avatar
Nathan Berelowitz
Posts: 2196
Joined: 25 Jan 2007, 14:17
Location: Pretoria, South Africa

Re: Hercules - Rail, rope, removal

Post by Nathan Berelowitz »

Doga?, I mean dogs!!
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Re: Hercules - Rail, rope, removal

Post by John Ashworth »

And there was me thinking a doga was some rare Santa-like reindeer which had appeared out of the wilderness of the overgrown old Magaliesberg line at the end of our site, where the last few remaining members of the species had taken refuge, and was just waiting to help FOTR establish the new site...
Image
Post Reply

Return to “FOTR - The New Hermanstad Site”