Daspoort signal

Members can post FOTR related pictures of the new Hermanstad Site here - screenshots or photographs - 800x600 pixels. Maximum size 130k. They will be pruned after 90 days. If you want to keep them for later, save them to your hard drive!
Post Reply
User avatar
John Ashworth
Site Admin
Posts: 23606
Joined: 24 Jan 2007, 14:38
Location: Nairobi, Kenya
Contact:

Daspoort signal

Post by John Ashworth »

Nathan wrote:When doing the Cullinan trains, the load is pulled into Hercules station and
then propelled back to the signals at Daspoort. This is a delicate mainlihne
operatiojn, and this signal viewed here is our final one to stop at, for
the clearance to proceed onwards to Capital Park route.
Photo by Nathan Berelowitz 7th September 2008
Attachments
Daspoort signal
Daspoort signal
Hercules to cullinan 7sept2008 010.jpg (50.04 KiB) Viewed 1100 times
Image
Post Reply

Return to “FOTR - The New Hermanstad Site”