Hermanstad improvements August 2010 - 4

Post by John Ashworth »

Photos and captions by Nathan Berelowitz, August 2010
Attachments
Early one Sunday morning, the men are at work digging, replacing and packing ballast to get the point and track work ready for the busy season of FOTR lying ahead.
Early one Sunday morning, the men are at work digging, replacing and packing ballast to get the point and track work ready for the busy season of FOTR lying ahead.
's 041.jpg (96.02 KiB) Viewed 1682 times
Two of the sleepers painted up with old motor car oil and replaced
Two of the sleepers painted up with old motor car oil and replaced
's 044.jpg (84.21 KiB) Viewed 1682 times
Jacking up the track. This is being done to raise the track level slightly due to poor drainage during rainy season. Many rotten sleepers were eventually replaced.
Jacking up the track. This is being done to raise the track level slightly due to poor drainage during rainy season. Many rotten sleepers were eventually replaced.
's 048.jpg (95.8 KiB) Viewed 1682 times
Image
User avatar
Nathan Berelowitz
Posts: 2196
Joined: 25 Jan 2007, 14:17
Location: Pretoria, South Africa

Re: Hermanstad improvements August 2010 - 4

Post by Nathan Berelowitz »

Just looking at these photos and seeing how much effort, noise and tool requirements are needed to work with sleepers, makes you think how much of this type of equipment and manpower is needed to remove sleepers illegaly for other purposes than railway lines. A-LA Cullinan sleeper theft so professionally done!!